Select of Marine Engineering Designs, Dredging and Construction Activities
PROJECT 1:
HAVANA EAST POWER PLANT
In this project he has been involved in the design and construction of the cooling channel for this Power Plant with one thousand six hundred meters excavated in hard rock underwater.
The works done were blasting, excavation, and dredging of half million of cubic meters.
PROJECT 2:
HAVANA PORT PLAN:
Here he has done:
HAVANA Container Terminal
Here it was done the design and construction of 460 meters of berths, shelters, pavement, port installations, and dredging. Fifteen millions of cubic meters of waste soils were removed. The main solution of the berth has been done with sheet piles walls Larsen V and precast concrete piles 45 for 45, with 20 meters of length. The draft is eleven and half meters.
HAVANA Roll ON Roll off and Sixth Zone
Here it was done the roll on roll off berth. This is the berth hammer. This is the Six Zone. Here he has done the design and construction of a new port zone for general cargo, and the fishery port. Four millions of cubic meters on clays and silts were dredged. The draft is eleven and half meters.
HAVANA General Cargo Four berth Zone
It has been done the construction and design of a new port zone. The berths 20, 21, 22 and 23, shelters, storages, pavements, port installations, and six millions of cubic meters dredged.
The Structural Solutions was with sheet piles Larsen V and concrete piles 45 for 45 with 21 meters of length. Draft: Eleven and half meters.
HAVANA Refinery Port
It has been done the Reconstruction project for one of the existing jetties and the design of a new one. Mooring and berth installations of Larsen V piles, cofferdams and precast concrete beams and caps. The berth capacity supports four vessels, up to 200 meters length.
HAVANA Forty Thousand Tons Floating Dock
Here he has been involved in the design of dredging and installation for this floating dock. The main works were: Dead weights anchoring underwater and chains installations.
HAVANA Dry Dock Repair
It has been done with concrete floating caissons, and constructed three hundred meters of new berths. Done Dredging and land reclamations works.
PROJECT 3
HAVANA CRISTINO NARANJO BREAKWATER
Here he has done the design and construction of half kilometer of breakwater with 25 tons tetra pods. The depth is six and half meters, and the design wave is the Atlantic Ocean one with seven point four meters high.
PROJECT 4
HAVANA MARINA HEMINGWAY
This is a resort marina installation. Here it has been done the dredging, land reclamation and walls repair.
PROJECT 5
MARIEL SUGAR TERMINAL
Here he has done the design and construction of berthing and mooring structures, with metal sheet piles and cofferdam of the bulk sugar terminal.. Draft eleven meters.
PROJECT 6
MARIEL BULK CEMENT TERMINAL
Here he has done the design and reconstruction of the cement jetty with precast concrete piles 45 x for 45. The jetty has 220 meters. The draft is eleven point five meters.
PROJECT 7
CIENFUEGOS PORT
Here he has done
:
PROJECT 8
NUCLEAR PLANT COOLING CHANNEL
Here it has done the Design and Construction of one thousand six hundred meters of channel with blasting. Two and half millions of rocks were excavated, -one third of them under water-.
PROJECT 9
CIENFUEGOS HEAVY CARGO BERTH
He has been done the design and construction of a new auxiliary berth for high loads and supplies to the Cienfuegos nuclear Plant. Solution with metal sheet piles and cofferdams.
PROJECT 10
CIENFUEGOS REFINERY JETTY
The design of this jetty has been done with Soyusmornii project and he has done the construction. The berth structures, has been done with metal driven piles diameter one meter, precast concrete caps, beams and slabs. The joining structure has been done on heavy rocks.
PROJECT 11
SANTIAGO DE CUBA PORT PLAN
Here he has done:
PROJECT 12
GENERAL CARGO BERTH
This is a new port zone. Here he has done the design and construction of one thousand six hundred meters of berth. The structural solution was done with metal and concrete sheet piles walls.
PROJECT 13
SANTIAGO DE CUBA REFINERY JETTY
The design of this jetty is a twin of the Cienfuegos refinery one for similar vessels.
The draft is twelve meters. He has done the construction of structures with metal driven piles diameter one meter, precast concrete caps, beams and slabs.
PROJECT 14
SANTIAGO DE CUBA CEMENT TERMINAL
Here he has done the design and construction of the berthing structures with sheet piles and cofferdam for cement cargo vessels.
This is the operating platform, and here exist additional mooring points.
PROJECT 15
FELTON POWER PLANT CHANNEL
Here he has done the Redesign and construction of one kilometer of cooling channel. The improvement was done changing the concrete walls with metal sheet piles and the schedule of the plant was accelerated in one year. Twelve thousands cubic meters of concrete were saved.
This Project was awarded as premium innovation of the year in the construction field.
PROJECT 16
KAY COCO CAUSEWAY
Here he has done the design and construction of seventeen kilometers of causeway in shallow waters with fifty hydraulic bridges. There is one lifting bridge that allows the vessels navigation trough the causeway.
PROJECT 17
VARADERO BEACH
Here he has designed and nourished seventeen kilometers of coastal line. Transported and supplied 5 million of cubic meters of sand with a Trailer Hopper Suction Dredge to the shore line.
PROJECT 18
MATANZAS VERY LARGE CARGO CARRIER BERTHS
The installation has three berthing points for Very Large Cargo Carriers. He has designed the auxiliary port, and acted as technical counterpart in front of UIE from France.
PROJECT 19
MEXICO CHETUMAL PORT DEVELOPMENT
He has done the feasibility study for one billion tender to develop port capacities under the North America Free Trade Agreement, to export oil and customs to South America from the United States and Canada.
PROJECT 20
CAMPOSOT PORT AND BEACHES, SPAIN
Here he has done a full coastal engineering field study, laboratory and mathematical modeling. It was analyzed the hydrodynamic of the estuaries, sand transport, sedimentation process, winds, waves and currents.
The task was to define the impact of the industrial port dredging on the navigation channel, the sport port and on the beach shore line.
PROJECT 21
PANAMA CONTAINER TERMINAL, BALBOA PORT
Here he acted as a project director during the tender process with Louis Berger Group. It represents a Development Program with one km of berths, land reclamation, extraction of sunken vessels, main technical solutions and work statements. Project was awarded
The most important- in this project- is the organization and work statements because all the construction activities should with present port operations, simultaneously.